Maple Road (Foster) Bridge Post-Tensioning System to Be Removed
The Washtenaw County Road Commission is planning to remove the post-tensioning system from the Maple Road (Foster) Bridge in Ann Arbor Township. A new, lower weight limit will be set once the work is completed. Photo: Pictured is a post-tension system (broken steel cable) on the Maple Road (Foster) Bridge over the Huron River, located between Huron River Drive and Country Club Road ...